Information for Solar Panel Suppliers
Back to front pageTogether, we can find the best solution for each building.
Would you like to discuss solutions? Please contact us.
Need more help? Frequently Asked Questions
How does the process start?
Contact us as early as possible. The responsible installer or electrician for the solar panel system needs to order the metering equipment from VENI Metering.
Which type of meter will be used?
A large AMS meter for production will be used.
How will the meters be installed?
Meters should normally be installed behind the main meter and not behind a series meter. Meters for solar energy should be installed by the responsible installer/electrician for the solar panel system. VENI Metering coordinates the installation.
What information does VENI Metering need?
We need information about the voltage, the size of the inverter fuse, and the meter number of the main meter.
Individual measurement & billing and tenant consumption
To ensure accurate billing and the ability to monitor consumption, it is recommended that all tenants are billed with individual meters. An individual meter ensures that each tenant pays for the energy they consume, and provides access to digital data via the HAN port.